EXTERNAL SOURCES and DATA LINK

The DATA LINK object can link workflows; I think. It has been suggested to me that it is possible to create another copy of “prepare data for RSABE analysis..”. The original copy would be used to calculate WR variance as it is written. A new copy could be developed and added to calculate WT variance.

I have looked at the workflow to study how this could be done. For the copy (WT) the transformation code can be changed to allow T1 and T2 completed subjects to be included.

At this point I have a problem since I do not know how to send the results of the transformation (results) to the External sources in continuation workflow. The first workflow on LHS contains the result worksheet to be sent to External sources continuation on RHS

I had planned to link it to Data link. One object already there is the results for the WR variance (as you would expect in the original). I was thinking to remove that result worksheet (WR) already there and replace it with the one I am developing for WT. So I would have created a workflow that can produce both the WR and WT variances.

Is it possible to do this,

Angus